Grid Ref: TQ00405185
Point of interest #188 What's this?
Guildford
River Wey
Status: Not discharging
Last Discharge Alert At: 06 May, 2024 at 10:28pm
Discharge Alert Length: 126.0 minutes
- Reporting Group: Zero Guildford : River Wey at Guildford
Upstream
Before this point of interest What's this?Stoke Lock Pontoon
River Wey (river)
Qualitative
From the latest observation date of 10 May, 2024
Notes
Total Coliforms above testing limit >4839.2 cfu/100mL
Location: Stoke Lock Pontoon
Latest photos
No photos uploaded.
Downstream
After this point of interest What's this?Downstream of Slyfield Treatment Works
River Wey (river)
Qualitative
From the latest observation date of 11 May, 2024
Notes
Both Total Coliforms and E.coli were above detection limit with 50% dilution. Reading >4839.2CFU/100mL.
Location: Downstream of Slyfield Treatment Works
Latest photos
No photos uploaded.