Black Creek bridge at College Road (Upstream)

Black Creek

Ontario, Canada

There is a narrow bridge crossing over Black Creek on College Road. The road is narrow, and some local traffic passes through it. Wearing high-visibility clothing is recommended at this site. Water samples are collected from the upstream (South-facing) side of the bridge using a throw bucket.

There are a few nearby features that may impact water quality. This site is upstream of the QEW; however, it is downstream from the Stevensville pumping station and a metal manufacturing industry. There is also a cemetery near the site.

Location created by
Kiersten McCutcheon

Latest photos

View all photos

Water level appears to be low.

30 Mar 13:25 by Gerry Finlayson

There was some flow on the east bank but not accessible due to flooding. The creek is still 99% covered.

06 Mar 14:30 by Gerry Finlayson

Nothing worth noting

23 Feb 13:50 by Gerry Finlayson

Melt water on surface of ice and plenty of snowmobile and 4 wheeler tracks.

26 Jan 12:50 by Gerry Finlayson

High water flow.

29 Dec 14:45 by Gerry Finlayson

Ice is forming on the edges of the bank upstream of the bridge.

17 Dec 16:15 by Kiersten McCutcheon