MIS-E-01

Stormwater pipe discharge + Mission Ck - MIS-E-01 Medium Priority

North Vancouver, British Columbia, Canada

location of MIS-E-01 using zoom on web app. South side of 23rd St. Two large storm drains emerge side by side with a smaller one of 0.2m inside diameter in between (do not monitor the small one). This is the eastern one which is 0.87m in diameter of concrete. Moderate energy location combining Mission Creek with storm drains from Highway #1. Field measured GPS coordinates in NAD83 are -123.0863960, 49.33019138 in Long and Lat, or UTM 495,731E, 5,464,169N Old Salt project site is the flow from W-01 and W-02 combined

Location created by
Paul Lhotka
  • Site ID: MIS-E-01
  • Lat: 49.3301705
  • Lng: -123.0860998
  • Waterbody Type: Unknown
  • Timezone: America/Vancouver

Latest photos

View all photos

Turbid water, but in darkness the Secchi Tube could not be used. 6PPD-Q and lab water sample for BV collected simultaneously

30 Jan 21:58 by Marissa Hoftiezer

Turbidity <14. Totally clear

29 Jan 10:55 by Paul Lhotka

Turb <14
Flows: 9L/ 3.13 s
10L/3.28 s
10 L/ 3.16s

15 Jan 10:12 by Susan Germain

Turbidity high but unable to read; water appeared black.
In-situ (Water Rangers) measurements taken separately from E and W outfalls.
Lab water samples collected from stormwater pool (combined flow) for analysis at Bureau Veritas and 6PPD-Q samples also collected from pool for UBC to analyze.

06 Dec 21:15 by Carolynne Robertson

Turbidity less than 14

28 Nov 08:19 by Susan Germain

Turbidity <14

09 Nov 12:23 by Paul Lhotka

Turbidity <14

07 Nov 12:27 by Paul Lhotka

Ysi simultaneous reading

Turb less than 14

No strips for pH etc

14 Oct 13:25 by Susan Germain

Turbidity <14 NTU. YSI measurements taken at same time. 6PPD-Q samples for Tim Rodgers from the combined flow of MIS-E+W-01

04 Oct 07:40 by Carolynne Robertson

Turbidity less than 14

Water flow

5.66 sec and 12.5L
5.60 sec and 10L

03 Oct 11:42 by Katherine Callaghan