Stormwater pipe discharge
North Vancouver, British Columbia, Canada
corrected location of WAG-E-03 using zoom on web app. This is where a concrete storm pipe of 0.9m inside diameter surfaces and joins with Wagg Creek just downstream of a pedestrian bridge over the creek on the east side. A large plunge pool with large boulders forms a deep pool due to high energy discharge during storm. Field measured GPS coordinates in NAD83 are -123.0871740, 49.32245002 in Long and Lat, or UTM 493,665E, 5,463,306N
- Group: North Shore Streamkeepers Society : Wagg Creek Water Quality Monitoring Group
- Site ID: WAG-E-03
- Lat: 49.3223528
- Lng: -123.0872369
- Waterbody Type: Unknown
- Timezone: America/Vancouver
Latest photos
View all photosStormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2022-01-22
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-12-16
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-10-21
Water turbid and darkish all the way upstream
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-10-07
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-08-22
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-08-01
Some water discharging from pipe, visual evidence of an old paint spill. Paint remains on vegetat...
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-07-01
smell of sewage/phosphorous. Pipe discharging a moderate amount of water. Water looks cloudy.
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-06-11
Water high, flashy, silty. Large, fast volume of discharge from storm pipe. Suspect low conductiv...
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-05-29
water cloudy, strong chemical smell, film on water surface
Stormwater pipe discharge : 15th Street Storm drain - WAG-E-03 High Priority
Observed on
2021-04-29
Greyish particulates could be observed on water surface. Water was grey and cloudy and appeared t...